ODESA - BRODY OIL PIPELINE

Feasibility study, Detail Design, Construction supervision.

Customer:

"Druzhba" Main Oil Pipeline Branch of OJSC "Ukrtransnaftf" (Ukraine).

Year of execution: 2002

Project Objective: to transfer oil from MOTC "Pivdenniy" (Yuzhny port) to LODS "Brody" to supply Ukrainian refineries and consumers in Eastern Europe.

Basic engineering solutions:

  • Construction of the oil pipeline using shop insulated 12 mm thick pipes, Ø1020 mm
  • Application of telecontrol system (APCS) manufactured by ММТ, Hungary.
  • Fiber-optic communication system (FOCS).

  • Application of gate valves with IQ and Rotork type drives.
  • Pig scraper injector/receiver valve and diagnostic units.

Basic technical data:

Pipeline length - 674 km
Diameter - 1020 mm
Intermediate OPS - 2
Throughput capacity of starting complex (excluding  intermediate stations) - 9 million t/year
Total throughput capacity - 30 million t/year