MAIN OIL PRODUCT PIPELINE MOZYR - BERNADY - PRILUKI

Feasibility study for construction

Customer:

"Gomeltransneft "Druzhba", JSC (Republic of Belarus)

Year of execution: 2013

Project Objective: progressive transfer of gasoline and diesel fuel from “Mozyr Oil Refinery", JSC to the tank farms: Pinsk, Kobrin, Baranovichi, Volkovysk and end point Bernady-Priluki.

Basic technical data:

Pumping capacity - 1,55 million tons / year
Pipeline total length - 565 km
-  Mainline - 456 km
- 325 mm diameter - 233 km
- 273 mm diameter - 225 km
-  Pipe branches - 107 km
- 219 mm diameter - 98 km
- 159 mm diameter - 3 km
- 108 mm diameter - 9 km
Oil pumping stations - 3